Renderings of Grand Central Terminal

0
(0)

Opened in 1913, Grand Central Terminal covers 48 acres, and has 44 platforms, servicing 56 tracks, 30 tracks on the upper level and 26 on the lower. One track secretly goes to the Waldorf-Astoria Hotel

Street-level plan of Grand Central

Cut-away diagram of Grand Central, showing underground rail systems

Cut-away view, published in Scientific America, 1912

Another cut-away view, from an unknown magazine

Bird’s eye view sketch of Grand Central c.1913

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Reply (Name and Email, not required, but post will be moderated)